TxDOT: Right Outside Lane of I-30 Eastbound Closed Between Ballpark Way, Six Flags Drive Through July 20, 2024
30 360 Project
The Texas Department of Transportation's work continues on the $233 million Interstate 30/SH 360 Interchange Project in Arlington. The project was substantially completed by the end of 2023.
In the last quarter, crews have focused their efforts to complete the new pavement on Six Flags Drive between I-30 and SH 360. Crews are now working on general construction items throughout the project including placing sod, working on landscaping and preparation for vegetation, placing rip rap, completing sidewalks, placing small traffic signs, and completing high mast lighting.
Closures listed below are subject to changes due to weather and schedule. For more information and new project photos, please visit the Keep 30360 Moving website.
New or updated items are indicated in bold.
Click here to learn more about the I-30/SH 360 Interchange Project.
I-30 Mainlanes and Ramps
I-30 Westbound Mainlanes
- Effective, Nov. 22, 2023: The I-30 westbound mainlanes switched to its permanent location between Great Southwest Parkway and Ballpark Way. WATCH FOR NEW TRAFFIC PATTERN.
I-30 Eastbound Mainlanes
- Daily, July 13-20, 9 a.m. - 3 p.m.: The right, outside lane of I-30 eastbound mainlanes between Ballpark Way and Six Flags Drive will be closed for general construction.
- Continuous, Aug. 9, 8 p.m. - Aug. 12, 5 a.m.: I-30 eastbound mainlanes will be reduced to one lane between AT&T Way/Baird Farm Road to SH 360 for pavement maintenance. EXPECT SIGNIFICANT DELAYS. SEEK ALTERNATE ROUTES.
- Effective, Sept. 10, 2023: I-30 eastbound mainlanes switched to its permanent location between Ballpark Way and Great Southwest Pkwy. WATCH FOR NEW TRAFFIC PATTERN.
I-30 Westbound Exit to SH 360 Northbound
- Effective Oct. 1, 2022: This direct connector ramp from I-30 westbound mainlanes to SH 360 northbound mainlanes has been placed into service.
I-30 Westbound Exit to SH 360 Southbound
- Effective, March 21, 2023: The direct connector ramp from I-30 westbound to SH 360 southbound mainlanes is anticipated to be placed into service.
I-30 Eastbound Exit to SH 360 Southbound
- Effective Aug. 9, 2020: This direct connector ramp from I-30 eastbound mainlanes to SH 360 southbound mainlanes is now in service.
I-30 Eastbound Exit to SH 360 Northbound
- Effective, June 27, 2023: The 2nd exit lane to access the direct connector was placed into service.
- Effective May 6, 2023: This direct connector ramp from I-30 eastbound mainlanes to SH 360 northbound mainlanes was placed into service.
I-30 Westbound Entrance from SH 360/Six Flags Drive
- Effective Sept. 2, 2022: The I-30 westbound entrance ramp from SH 360/Six Flags Drive was returned to service.
- Effective Aug. 26, 2020: A new traffic signal is active at the intersection with the new, permanent I-30 westbound exit ramp to SH 360/Six Flags Dr. Traffic passes through this signalized intersection to access the westbound I-30 entrance ramp. BE AWARE OF NEW TRAFFIC PATTERN.
I-30 Eastbound Exit to SH 360/Six Flags Drive
- PERMANENT: Effective June 19, 2021: The I-30 eastbound exit to SH 360/Six Flags Drive is detoured to exit for the current eastbound exit to Six Flags Drive.
I-30 Westbound Exit to SH 360/Six Flags Drive
- Effective Aug. 26, 2020: A new I-30 westbound exit ramp to SH 360/Six Flags Dr is open to traffic, replacing the previous loop exit ramp. Traffic makes a left turn through a signalized intersection to continue across I-30 towards SH 360. BE AWARE OF NEW TRAFFIC PATTERN.
I-30 Eastbound Entrance from Convention Center Drive/Copeland Road Intersection
- PERMANENT: The eastbound I-30 entrance ramp available from the Convention Center Drive/Copeland Road intersection will be closed permanently. Traffic will continue to have access to the ramp to northbound Ballpark Way.
I-30 Eastbound Entrance from Northbound Ballpark Way
- PERMANENT: The eastbound I-30 entrance ramp from northbound Ballpark Way will be closed permanently for the construction of a new northbound Ballpark Way connector to eastbound Copeland Road
I-30 Westbound Exit to AT&T Way/Baird Farm Road
- Effective, Nov. 22, 2023: The I-30 westbound exit to AT&T Way/Baird Farm Road is accessible from the managed lane entrance near Great Southwest Parkway.
I-30 Eastbound Entrance from AT&T Way/Baird Farm Rd
- Effective Sept. 10, 2023: The I-30 eastbound entrance from AT&T Way/Baird Farm Rd will be closed for traffic safety barrier reconstruction. Upon completion of the work, access to enter will closed until the managed lane is returned to service.
I-30 Westbound Frontage Road
- Effective Feb. 11, 2022: The I-30 westbound frontage road between Six Flags Drive and Ballpark Way was opened.
I-30 Eastbound Frontage Road
- Daily, July 6-27, 9 a.m. - 3 p.m.: The I-30 eastbound frontage road will have various lanes closed between Ballpark Way and 107th Street for general construction.
- Oct 15, 2022: The I-30 eastbound frontage road between Copeland Rd and Six Flags Drive was placed into service.
I-30 HOV Lanes (between Great Southwest Parkway and Cooper Street)
Westbound I-30 HOV lane west of SH 161
- The westbound HOV lane west of SH 161 will be closed. TEXpress lane traffic will be directed into the I-30 westbound general main lanes west of SH 161.
Eastbound I-30 HOV lane between Center Street and Duncan Perry Road
- The eastbound HOV lane access near Center Street and lane through Tarrant County will be closed. TEXpress lane traffic will enter at SH 161.
SH 360 Mainlanes and Ramps
SH 360 Southbound Entrance from Brown Boulevard/Avenue K
- PERMANENT: The SH 360 southbound entrance from Brown Boulevard/Avenue K is PERMANENTLY CLOSED. Traffic is detoured along the SH 360 southbound frontage road to enter from the Six Flags Drive entrance ramp. A new entrance ramp will be constructed between Lamar Boulevard and Six Flags Drive.
SH 360 Northbound Exit to Brown Boulevard/Ave K
- PERMANENT The SH 360 northbound exit to Brown Boulevard/Ave K is PERMANENTLY CLOSED to construct a new entrance ramp between Ave J and Brown Boulevard/Ave K. Traffic will be directed to exit Six Flags Drive and continue on the SH 360 northbound frontage road to Brown Boulevard/Ave K.
SH 360 Northbound Entrance from Ave J
- Effective May 3: The new, SH 360 northbound entrance from Ave J was placed into service.
SH 360 Northbound Entrance from Lamar Boulevard
- PERMANENT: The SH 360 northbound entrance from Lamar Boulevard is PERMANENTLY CLOSED. Traffic will be detoured along the SH 360 northbound frontage road to enter from the Brown Blvd/Ave K entrance ramp. A new permanent entrance ramp will be constructed between Ave J and Brown Blvd/Ave K.
SH 360 Northbound Exit to Lamar Boulevard
- The SH 360 northbound exit to Lamar Boulevard is closed for reconstruction. Traffic is directed to exit Six Flags Drive and continue on the northbound frontage road to Lamar Boulevard.
SH 360 Southbound Exit to Ave J/Lamar Boulevard/Six Flags Drive/Randol Mill Road
- A new SH 360 southbound exit ramp to Avenue J/Lamar Boulevard is open to traffic.
SH 360 Southbound Exit to I-30 Westbound
- Effective Aug 1, 2020: This direct connector ramp is open to traffic.
SH 360 Southbound Exit to I-30 Eastbound
- March 17, 2023: The direct connector ramp from SH 360 southbound to I-30 eastbound was placed into service.
SH 360 Northbound Exit to I-30 Eastbound
- Effective, Dec. 21, 2023: The direct connector ramp from SH 360 northbound to I-30 eastbound was placed into service.
SH 360 Northbound Exit to I-30 Westbound
- Effective, Dec. 21, 2023: The direct connector ramp from SH 360 northbound to I-30 westbound was placed into service.
SH 360 Southbound Exit to Lamar Boulevard
- PERMANENT: The SH 360 southbound exit to Lamar Boulevard is PERMANENTLY CLOSED. Traffic is detoured to exit to Brown Boulevard/Avenue K and follow the SH 360 southbound frontage road to Lamar Boulevard. A new exit ramp will be constructed to Avenue J/Lamar Boulevard/Six Flags Drive.
SH 360 Northbound Exit to Lamar Boulevard
- Effective, May 1: The SH 360 northbound exit to Lamar Boulevard is anticipated to be placed into service.
- Through Spring 2023: The SH 360 northbound exit to Lamar Boulevard is closed for reconstruction. Traffic is directed to exit Six Flags Drive and continue on the northbound frontage road to Lamar Boulevard.
SH 360 Southbound Entrance from Lamar Boulevard
- Effective Jun 29, 2021: The new, permanent SH 360 southbound entrance from Lamar Blvd is in service.
SH 360 Southbound Entrance from Six Flags Drive
- PERMANENT on April 28: The temporary SH 360 Southbound entrance from Six Flags Drive was permanently removed from service. Traffic is directed to the next entrance from SH 180/Division Street.
SH 360 Northbound Exit to I-30/Six Flags Drive
- Effective July 17, 2023: The SH 360 northbound exit to I-30/Six Flags Drive was closed for construction of northbound direct connectors. Traffic is directed to exit SH 180/Division Street/Randol Mill Road and continue on the SH 360 northbound frontage road.
- Effective Jan. 6, 2021: The SH 360 northbound exit to I-30/Six Flags Dr/Lamar Blvd/Ave J was moved to a new, temporary exit ramp.
- Effective, July 17, 2023: The SH 360 northbound exit to I-30/Six Flags Drive/Lamar Boulevard/Ave J is closed . This is a permanent closure. Six Flags Drive traffic is directed to exit for SH 180/Division Street/Randol Mill Road/Six Flags Drive.
SH 360 Frontage Road
SH 360 Southbound Frontage Road
Six Flags Drive
- Continuous, through July 2024: The SH 360 southbound frontage road is reduced to one lane leaving the Six Flags Drive intersection for pavement and general construction. EXPECT DELAYS.
SH 360 South-to-North U-turn at Six Flags Drive
- Effective Nov. 8, 2018: The SH 360 south-to-north U-turn at Six Flags Drive will be closed while the SH 360 mainlanes and northbound frontage road are under construction.
SH 360 Northbound Frontage Road
Ave E to Six Flags Drive
- Continuous, through July 2024: The SH 360 northbound frontage road is reduced to one lane between Ave E and Six Flags Drive. EXPECT DELAYS.
Glenn Drive to Brown Boulevard/Ave K
- Daily, May 7-Jul 13, 9a-3p: The SH 360 northbound frontage road between Six Flags Dr and Brown Blvd/Ave K will have various single lane closures for sidewalk and general construction.
Ave J to Brown Blvd/Ave K
- Continuous, through August 2024: The right, outside lane of SH 360 northbound frontage road from Ave J to the SH 360 northbound entrance ramp will be closed for sound wall construction.
SH 360 North-to-South U-turn at Six Flags Drive
- Effective Nov. 8, 2018: The SH 360 north-to-south U-turn at Six Flags Drive will be closed while the SH 360 mainlanes and northbound frontage road are under construction.
Local Streets
Ave J
- Daily, July 11-20, 9 a.m. - 3 p.m.: Various lanes of eastbound and westbound Ave J approaching and over SH 360 will be closed for general construction and clean up.
Lamar Boulevard
- Daily, July 11-20, 9 a.m. - 3 p.m.: Various lanes of eastbound and westbound Lamar Blvd approaching and over SH 360 will be closed for general construction and clean up.
Copeland Road
- Daily, July 15-17, 9 a.m. - 3 p.m.: Copeland Road between the I-30 eastbound frontage road and Six Flags Drive will be closed for general construction. Traffic will be detoured along the frontage road to the Six Flags Drive intersection, then back westbound on Six Flags Drive.
- PERMANENT: Copeland Road between Six Flags Drive and the SH 360 southbound frontage is closed.
- PERMANENT: Westbound Copeland Road from Six Flags Drive to just east of Ballpark Way is permanently closed. Only eastbound Copeland Road traffic will be allowed between Ballpark Way and Six Flags Drive.
Six Flags Drive
- Daily, July 6-16, 9 a.m. - 3 p.m.: The left, inside lane of eastbound Six Flags Drive will be closed from SH 360 to Lamar Boulevard for landscaping work.
- Effective May 23, 2023: Eastbound and westbound Six Flags Drive are reduced to one lane each direction between Copeland Road and I-30. EXPECT DELAYS. WATCH FOR NEW TRAFFIC PATTERN.
Convention Center Drive/Copeland Road Intersection
- PERMANENT: The I-30 eastbound entrance ramp available from this intersection was removed permanently from service. Access to northbound Ballpark Way is maintained.
105th Street
- PERMANENT: 105th Street between Six Flags Drive and Avenue E is permanently closed and will be removed.
Enhance Regional Mobility, I-30/SH 360 Interchange, SH 360 Widening Project, Street Construction Projects
News, Streets, Headlines